BS9990:2015 British Standard for Dry Risers & Fire Hydrants

Dry Riser Regulations

BS9990:2015 is the current British Standard that regulate design, installation, testing and maintenance of dry risers. It details the legal requirements for the installation and maintenance of dry risers in the UK.

BS9990  (Non-automatic firefighting systems in buildings Code of practice) dictates that dry risers should have an operating pressure of 12 bar and be visually inspected every 6 month and tested annually.

When Do You Need Dry Risers?

Dry risers need to be installed in buildings where the floor is between 18 & 60 meters above ground level as dictated by Approved Document B (Fire Safety) of the
Building Regulations (England & Wales). This is roughly equivalent to buildings of more than 6 stories and less than 17.

Legal Requirements for Installation and Maintenance of Dry Risers

BS9990 gives requirements and recommendations for non-automatic fire-fighting systems in buildings. It covers good practice in matters affecting the design, installation, testing and maintenance of such systems including wet and dry fire-fighting mains.  At Dry Risers Direct we design, install and maintain all our dry riser projects to the BS9990:2015 Standards.

BS9990 was first published in 2006, with the latest edition release in January 2015 by BSI Standards Ltd.  The latest release of 2015 does not give guidance on when and where Wet and Dry riser systems are needed, this guidance is issued by Building Regulations.
 
BS9990 deals solely with design, provision, installation and maintenance. Guidance on hose reels and foam inlets remains in the revised BS 5306 part 1). The key areas that were revised in the 2015 version are flow tests and pressures, rising and falling mains, pumps, maintenance and shut off pressures.

PURCHASE FULL VERSION

BS9990:2015 Summary of Key Points

The following is convenient summary of the key points in the BS9990:2015 standards for fire fighting systems, in particular the standards relating to Dry Risers. 

BS9990:2015 states that:

  • Dry fire mains should have an operating pressure of 12 bar.
  • A dry fire main should be fitted with a two-way inlet breeching for 100 mm mains. Each breeching should conform to BS5041-3 and be located in an inlet box conforming to BS5041-5, the enclosure must be between 400 mm and 600 mm above ground level.
    Floor-mounted (horizontal) inlets are not suitable for the majority of fire main applications.
  • Drain valves Inlet breechings should be fitted with a 25 mm drain valve, in accordance with BS5041-3.
  • An air release valve should be installed at the top of all vertical mains in order to vent air from the main.
  •  A landing valve should be provided at each floor level, including the ground floor level.
  • A landing valve should be installed with its lowest point about 750 mm above floor level.
  • Landing valves for fire mains should preferably be protected by, and installed within, a box in accordance with BS5041-4.
  • Landing valves for dry mains should conform to BS 5041-2. Outlets should be flanged rather than directly threaded to allow for ease of maintenance.
  • Position of inlets Inlet connections for a fire main should be installed in an external wall or in a boundary wall of a building as close as possible to the position of the main which they serve, ideally on the exterior face of the fire-fighting shaft and adjacent to the access point.
  • For typical building applications, the run of horizontal connecting pipe is a maximum of 18 m in length.
  • Where the fire-fighting shaft or fire-fighting stair is not adjacent to a perimeter wall, an assessment should be made as to whether more than one inlet needs to be provided.
  • If two or more inlets are provided, they should be sufficiently remote from one another to provide viable alternative locations from which to charge the fire main.
  • If there needs to be more than one fire main inlet for an installation it should be agreed with relevant approving authorities and the local fire and service.
  • In selecting positions for inlet connections, account should be taken of the positions of fire hydrants, the parking locations for fire appliances, and the effect that falling debris and other possible occurrences during a fire might have on the continuing viability of the location (see BS9991 and BS9999).
  • Inlets should be flanged rather than directly threaded to allow for ease of maintenance.
  • The number and disposition of rising/falling mains should be in accordance with BS9991 or BS9999 as appropriate. For large buildings or sites comprising multiple buildings, multiple horizontal or vertical fire main pipework runs should not be served from the same inlet connection.
  • Fire mains should be electrically earthed in accordance with BS7671 and BS7430. Those joints which do not provide electrical continuity should be bonded.

Services

Dry Riser Installation

Dry Riser Installation

Dry Risers Installation Experts: Your Trusted Partner in Fire Safety At Dry Risers Direct, we pride ourselves on delivering unparalleled...
Dry Riser Servicing

Dry Riser Servicing

We offer a comprehensive dry riser service for testing, routine maintenance and repairs. Where ever possible we aim to carry out any unscheduled repairs at the same time as the routine maintenance and testing on all dry risers to ensure an efficient, cost effective service and minimise disruption.

Projects


Protecting Homes with Dry Risers at Plumb Park

Date: June 2024Client: Taylor Wimpey

Dry Risers Direct recently completed an interesting dry riser design and installation project at Plumb Park in Exmouth, a site developed by Taylor Wimpey in partnership with Clinton Devon Estates.

This brand new build of 268 houses is situated on the border of Exmouth in beautiful green open space close to the sea. It includes a range of 2 bedroom apartments and 3 and 4 bedroom townhouses. Plumb Park is set close to the Devon countryside,...

More

Dry Risers on Building Estate

News Articles

19 - 12 - 2024

BS 9991:2024 – A Crucial Update in Residential Fire Safety Standards

Overview of BS 9991:2024 – Fire Safety in Residential Buildings and Summary of Updates BS 9991:2024, published in November 2024 is the UK’s primary fire...

More

14 - 11 - 2024

Installation Regulations for Dry Risers

Regulations for the installation of dry risers in the UK Dry riser design and installation is governed by British Standard BS9990 2015. It is a...

More

15 - 09 - 2024

Dry Riser Thefts

Lives endangered by increasing dry riser valve thefts We unfortunately regularly see Dry Riser thefts. As you can understand, this can have huge consequences not...

More

14 - 03 - 2024

Dry Riser Testing & Servicing Frequency

Servicing Requirements for Dry Risers Dry risers sit unused for years but it is vital that they are fully working and accessible when required. For...

More

Testimonials

Based on how reliable you guys are you will be the only people I come to for the dry riser installations— Joe Representative, London Fire Brigade GEM CONSTRUCT LTD

Joe, , RepresentativeLondon Fire Brigade GEM CONSTRUCT LTD

“We really enjoyed working with Dry Risers Direct and would happily recommend working with them because the process was so easy. Many thanks again for the service provided”

Danielle Aremia, Commercial ManagerTaylor Wimpey

Adrian, Apologies for the delay in getting back to you, I was out of the office on Friday.  Steve and Mathew did an excellent job both with the test and repair.  Thank you   Andy University of Huddersfield

more

We work with

Dry Risers Direct Limited,

Units 2 & 3 Millbank House,
Riverside Business Park,
Wilmslow,
Cheshire,
England,
SK9 1BJ


Enquire Here

Book Your Service

This website uses Cookies to improve your browsing experience and to help with our marketing. You can read more about removing Cookies here: View Cookies Policy

I'm fine with this